[^ top]

Add comment on:

Whose costs? OUR costs.
J Hart
As part of the ‘opt-out’ proceeding, the CPUC is focusing on what the opt-out program is costing the utilities (in terms of providing jobs to meter readers etc.). The regulators generally consider that the party whose actions create costs should be responsible for paying those costs. We agree!

Guidelines for commenting on news articles:

Thanks for contributing to Indybay's open publishing newswire. You may use any format for your response article, from traditional academic discourse to subjective personal account. Please keep it on topic and concise. And please read our editorial policy, privacy, and legal statements before continuing. Or go back to the article.

Comment Title (required)
Author (required)
E-mail     Display email?
URL
TEXT/HTML (required)
For plain text, URLs will be converted to clickable links. You may also use <a href="url">link</a> in plain text articles (other tags will be ignored unless you select "HTML"). When selecting "HTML", you must provide <p></p> and <br /> tags for paragraphs and line breaks.
 Is Text HTML?
Number Of Uploads
Maximum size of each uploaded file 480MB; maximum total size of all uploaded files 560MB; 6 hours maximum uploading time.
Accepted File Types: 3G2, 3GP, AMR, AVI, F4V, FLV, GIF, JPG, M3U, M4A, M4V, MOV, MP3, MP4, MPG, OGA, OGG, OGV, PDF, PLS, PNG, RAM, RM, TORRENT, WAV, WMA, WMV
For playability of media files on mobile devices, upload videos as MP4s with H.264 encoding. For audio, upload MP3s.
 CAPTCHA
Anti-spam questions (Required) What letter is missing from the alphabet: LMN_PQR?
What is 9 minus 3?

You must preview your post before publishing.