top

Add comment on:

Public Comment Period for Big Basin Preliminary General Plan/Draft EIR Ends August 1st
via California Department of Parks
The Big Basin Redwoods State Park Preliminary General Plan/Draft EIR is being circulated for public review and comment for a period of 45 days, which began on June 18, 2012. Public views and comments on this project are welcomed and must be in writing. Comments may be submitted by mail, fax, or email. All comments should be submitted with a contact name and mailing address for the public record and postmarked no later than August 1, 2012.

Guidelines for commenting on news articles:

Thanks for contributing to Indybay's open publishing newswire. You may use any format for your response article, from traditional academic discourse to subjective personal account. Please keep it on topic and concise. And please read our editorial policy, privacy, and legal statements before continuing. Or go back to the article.

Comment Title (required)
Author (required)
E-mail     Display email?
URL
TEXT/HTML (required)
For plain text, URLs will be converted to clickable links. You may also use <a href="url">link</a> in plain text articles (other tags will be ignored unless you select "HTML"). When selecting "HTML", you must provide <p></p> and <br /> tags for paragraphs and line breaks.
 Is Text HTML?
Number Of Uploads
Maximum size of each uploaded file 480MB; maximum total size of all uploaded files 560MB; 6 hours maximum uploading time.
Accepted File Types: 3G2, 3GP, AMR, AVI, F4V, FLV, GIF, JPG, M3U, M4A, M4V, MOV, MP3, MP4, MPG, OGA, OGG, OGV, PDF, PLS, PNG, RAM, RM, TORRENT, WAV, WMA, WMV
For playability of media files on mobile devices, upload videos as MP4s with H.264 encoding. For audio, upload MP3s.
 CAPTCHA
Anti-spam questions (Required) What is 7 plus 0?

You must preview your post before publishing.