top

Add comment on:

Lawmakers demand return to “policy before plumbing” on Delta plan
Dan Bacher
“We ask that you not finalize or formally announce this framework until a far more detailed description is made available for review. We do not believe it is wise to commit to massive new water pumping stations and conveyance tunnels while sustainable solutions to the problems of water quality, fish and ecosystem restoration, local impacts, and water flows are made to wait," the 12 northern California Representatives wrote. Photo: George Miller and 11 other Representatives called for a delay in the Bay Delta Conservation Plan to build a peripheral canal or tunnel.

Guidelines for commenting on news articles:

Thanks for contributing to Indybay's open publishing newswire. You may use any format for your response article, from traditional academic discourse to subjective personal account. Please keep it on topic and concise. And please read our editorial policy, privacy, and legal statements before continuing. Or go back to the article.

Comment Title (required)
Author (required)
E-mail
URL
TEXT/HTML (required)
Tip: use spaces between paragraphs.

For plain text, URLs will be converted to clickable links. You may also use <a href="url">link</a> in plain text articles (other tags will be ignored unless you select "HTML"). When selecting "HTML", you must provide <p></p> and <br /> tags for paragraphs and line breaks.

Number Of Uploads
Maximum size of each uploaded file 480MB; maximum total size of all uploaded files 560MB; 6 hours maximum uploading time.
Accepted File Types: 3G2, 3GP, AMR, AVI, F4V, FLV, GIF, JPG, M3U, M4A, M4V, MOV, MP3, MP4, MPG, OGA, OGG, OGV, PDF, PLS, PNG, RAM, RM, TORRENT, WAV, WMA, WMV
For playability of media files on mobile devices, upload videos as MP4s with H.264 encoding. For audio, upload MP3s.
 CAPTCHA
Anti-spam questions (Required) What is 9 plus 2?

You must preview your post before publishing.