Add comment on:

Bay MLPA process delayed until peripheral canal plan completed
Dan Bacher
"We look forward to continuing to work with all local, state and federal agencies dedicated to ensuring successful marine planning and protection for San Francisco Bay subsequent to completing planning efforts in the Sacramento-San Joaquin River Delta," said Secretary for Natural Resources John Laird and Director of Fish and Game Chuck Bonham.

Guidelines for commenting on news articles:

Thanks for contributing to Indybay's open publishing newswire. You may use any format for your response article, from traditional academic discourse to subjective personal account. Please keep it on topic and concise. And please read our editorial policy, privacy, and legal statements before continuing. Or go back to the article.

Comment Title (required)
Author (required)
TEXT/HTML (required)

For plain text, URLs will be converted to clickable links. You may also use <a href="url">link</a> in plain text articles (other tags will be ignored unless you select "HTML"). When selecting "HTML", you must provide <p></p> and <br /> tags for paragraphs and line breaks.

Number Of Uploads
Maximum size of each uploaded file 480MB; maximum total size of all uploaded files 560MB; 6 hours maximum uploading time.
Accepted File Types: 3G2, 3GP, AMR, AVI, F4V, FLV, GIF, JPG, M3U, M4A, M4V, MOV, MP3, MP4, MPG, OGA, OGG, OGV, PDF, PLS, PNG, RAM, RM, TORRENT, WAV, WMA, WMV
For playability of media files on mobile devices, upload videos as MP4s with H.264 encoding. For audio, upload MP3s.
Anti-spam questions (Required) What is 9 minus 1?

You must preview your post before publishing.