| About | Contact | Subscribe | Calendar | Publish | Donate |
|---|
East Bay | Education & Student Activism | Environment & Forest DefenseVIDEO: Bevatron Decontruction Update
A 3 and a half minute look at the Bevatron site. Visible are mounds of rubble covered in tarps, shipping containers, and a fleet of (de)construction vehicles. The Demolition Plan, the procedural order of deconstruction, has not been released to the public. There are questions as to groundwater pollution protocols in regards to the demolition. There are concerns regarding assessments of mercury contamination. Out of 4,700 truck loads, 2,700 will contain radioactively, and otherwise, contaminated material. ![]() bev3.jpg A 3 and a half minute look at the Bevatron site. Visible are mounds of rubble covered in tarps, shipping containers, and a fleet of (de)construction vehicles. The Demolition Plan, the procedural order of deconstruction, has not been released to the public. There are questions as to groundwater pollution protocols in regards to the demolition. There are concerns regarding assessments of mercury contamination. Out of 4,700 truck loads of material, 2,700 will contain radioactively contaminated material.
Proposed project (new labs): 4 acres Building 51: 126,000 gross square ft (currently office space, dry labs and storage) Bevatron apparatus: 180 ft diameter Save Strawberry Canyon: http://savestrawberrycanyon.org/ ![]() bev2.jpg ![]() bev1.jpg Clauss construction is a firm used toxic (de)constructions sites.
More images
Building 51
Debris covered in tarps.
|
Listed below are the latest comments posted about this article.
These comments are anonymously submitted by website visitors.